DESIGN-BUILD

Design-Build Services

In our design-build services, Force Construction's dedication to delivering projects that are both timely and within budget shines through. We aim to maximize the value of our clients' investments by optimizing the balance between functional design, cost-effectiveness, and swift completion. From the outset of your project, we're equipped to partner with you through every phase, including land acquisition, financing, design, construction, and beyond.


Our integrated approach to design and construction offers a streamlined process that significantly benefits our clients, both in terms of time and financial investment. This method facilitates a smooth progression from one phase to the next, ensuring that design development, specification finalization, and certification acquisition occur without delay. The result is a faster transition to operational status than traditional construction methods typically allow, underscored by our commitment to maintaining the highest standards of quality.

Contact Us to Learn More

Call (812) 372-8441 or use the form below.

Contact Us Below

EXAMPLES OF FORCE DESIGN-BUILD PROJECTS

A photo of the Circle-K Fieldhouse at NexusPark in Columbus, IN
28 Feb, 2024
In the heart of Columbus, Indiana, the Circle-K Fieldhouse at NexusPark stands as a premier example of Force Construction's design-build expertise, transforming the vision of a state-of-the-art indoor sports and event center into reality. This project, involving the strategic repurposing of a portion of the former FairOaks Mall property, showcases our ability to adapt and innovate, creating a 150,000 square foot facility that serves as a hub for athletic excellence and community events. As the design-builder, we worked closely with NexusPark stakeholders, ensuring that every aspect of the facility—from planning to execution—aligned with their vision, budget, and schedule. The Circle-K Fieldhouse boasts an array of features designed to accommodate a wide range of sports and activities. With state-of-the-art turf fields and basketball courts, the facility caters to athletes and teams seeking top-tier playing conditions. Our collaboration with Butler Manufacturing allowed us to implement advanced building components, facilitating a construction approach that minimized overhead risks while accelerating the project timeline. This partnership, a testament to our long-standing relationship with Butler, was instrumental in achieving the project's ambitious goals. Our work on the Circle-K Fieldhouse at NexusPark reflects Force Construction's commitment to enhancing community spaces through thoughtful design and construction practices. By prioritizing efficiency, safety, and the adaptive reuse of existing structures, we have contributed a vibrant and dynamic facility to the Columbus community. The Circle-K Fieldhouse is not just a testament to our construction capabilities but also a symbol of our dedication to fostering spaces that bring people together, promote active lifestyles, and support the growth of local sports and events.
Aerial photo of the Avery Dennison plant in Greenfield, Indiana
25 Aug, 2023
In Greenfield, Indiana, Force Construction recently completed a 62,000 square foot expansion of Avery Dennison's manufacturing and warehouse facility, furthering a longstanding partnership with this valued client. Completed in 2023, this project included 10 new shipping docks and expanded warehouse and shipping space, addressing space constraints and enhancing output efficiency. Key features of this expansion included the continuation of high-piled storage and ESFR (Early Suppression Fast Response) fire suppression systems, allowing for extensive high-piled storage throughout the warehouse. The construction also featured high-precision floor flatness and levelness (FFFL) standards, facilitating the use of narrow-aisle forklifts and Automated Guided Vehicles (AGVs) provided by the owner. A notable aspect of this project was the interim construction financing provided by Force Construction, which enabled the project to proceed smoothly and allowed for early owner occupancy. This innovative financial solution demonstrated our commitment to supporting our clients' needs and ensuring project continuity. Avery Dennison's investment in this expansion underscores their commitment to growth and operational excellence. The successful completion of this project highlights Force Construction's ability to deliver high-quality, precision-engineered industrial spaces, reinforcing our reputation as a trusted partner in large-scale industrial construction.
An aerial view of Ninth Avenue Foods in Columbus, IN
13 Dec, 2022
At Force Construction, we are honored to have been selected to bring Ninth Avenue Foods' vision to life with their first dairy processing facility in the Midwest, located in Columbus, Indiana. This design-build project encompasses a sprawling 260,000 square foot facility that stands as a testament to our capability to execute large-scale, complex projects with precision and innovation. The Ninth Avenue Foods facility is meticulously designed to support a wide range of operations essential to modern dairy processing. It includes dedicated areas for processing and packaging, alongside specialized storage spaces for dry and cold goods, ensuring the integrity and quality of products from production to delivery. The project also incorporates significant infrastructure and support spaces, designed to streamline operations and enhance efficiency across all stages of the dairy processing chain. A notable feature of this facility is the inclusion of a two-story office space, reflecting Ninth Avenue Foods' commitment to creating a productive and engaging work environment for their team. This space is crafted to foster collaboration and innovation, housing the administrative and operational teams that drive the company's success. This project marks a significant milestone for Ninth Avenue Foods as they expand their operations to the Midwest, and we at Force Construction are proud to play a pivotal role in this expansion. Our design-build agreement with Ninth Avenue Foods allowed us to work closely with their team from the initial concept through to completion, ensuring that every aspect of the facility was tailored to meet their specific needs and standards. The Ninth Avenue Foods dairy processing facility in Columbus, Indiana, is more than just a building; it's a cornerstone of the company's growth and a symbol of Force Construction's dedication to delivering exceptional quality and value to our clients. We are proud to contribute to the economic development of Columbus and to support Ninth Avenue Foods in their mission to provide high-quality dairy products to the Midwest and beyond.
A photo of the St. Peter's Athletic Facility in Columbus, Indiana
02 Jul, 2020
In Columbus, Indiana, Force Construction is honored to extend its long-standing partnership with St. Peter’s Lutheran Church and School through the completion of a state-of-the-art athletic facility. This $6.3 million gymnasium, affectionately named The Den, is designed to accommodate basketball, volleyball, physical education, and various community activities. Our history with St. Peter’s is rich, having previously constructed both the church sanctuary and the school. The Den marks another significant milestone in this enduring relationship, reflecting our commitment to supporting the growth and mission of St. Peter’s Lutheran Church and School. The Den features a seating capacity of 600, along with additional meeting rooms and space for fitness classes, embodying our commitment to multifunctional and community-centric design. The construction of this facility required close collaboration with St. Peter’s leaders to ensure it would serve both the church’s mission and the community’s needs. One of the most touching elements of this project was the inclusion of Scripture written on the flooring beneath the gym’s wood surface by St. Peter’s students, symbolizing the foundation of faith upon which this project was built. We are particularly proud of our ability to complete this project within budget, allowing the church to remain debt-free, which aligns with St. Peter’s philosophy of Godly stewardship. This facility is not only a testament to our advanced construction techniques and self-performing capabilities but also a symbol of the lasting relationships we build with our clients. The Den stands as a beacon of community spirit and faith, ready to inspire and serve for generations to come. Moreover, The Den is a shining example of our Design-Build capabilities. The facility was expertly designed by Force Design, a subsidiary of Force Construction, ensuring a seamless integration of design and construction processes. This integrated approach allowed us to deliver a facility that not only meets functional needs but also inspires and uplifts the community, reflecting the values of St. Peter’s Lutheran Church and School.
a photo of the front of CAPCO in Columbus, Indiana
25 Jun, 2020
In Columbus, Indiana, Force Construction has played a pivotal role in the development and expansion of CAPCO's manufacturing and office facilities, showcasing our expertise in creating architecturally significant buildings. Known for their preference for distinctive and aesthetically pleasing structures, CAPCO, a leader in high-precision stamping and manufacturing, has relied on Force Construction for master planning and multiple design-build projects over the years. Our team has executed various office and manufacturing space projects for CAPCO, incorporating high-precision stamping equipment and scrap conveyor tunnels. The buildings feature high-precision concrete, insulated metal panels, conventional steel framing, storefront glazing systems, and exposed structural concrete elements. These components are designed not only for functionality but also to enhance the architectural appeal of the facilities. One of the hallmark features of CAPCO's master plan is the inclusion of a courtyard, which influences the unique rectangular footprint of the buildings. This thoughtful design ensures a cohesive and visually appealing campus that aligns with CAPCO's architectural vision. As the design-build contractor, Force Construction integrated both the design and construction processes, ensuring seamless project execution and adherence to CAPCO’s high standards. Our commitment to delivering high-quality, precision-engineered spaces has helped CAPCO maintain its reputation for innovative and dynamic manufacturing environments. Our collaboration with CAPCO highlights our ability to integrate advanced construction techniques with architectural sensitivity, ensuring that each project meets the highest standards of excellence.
A photo of the Tipton Mills expansion in Columbus, Indiana
15 Apr, 2019
In Columbus, Indiana, Force Construction served as the design-build contractor for the expansion of Tipton Mills, a leading manufacturer in the powdered beverage industry. This expansion included new dry powder blending and warehouse space, enhancing Tipton Mills' capacity to produce a variety of powdered beverage products. Tipton Mills specializes in the formulation, blending, and packaging of premium functional powdered beverages, including dry drink mixes. Their products range from instant coffee to protein powders, all designed for uniformity and quick dissolving. The expansion project featured state-of-the-art dry powder blending facilities, designed to handle the precise requirements of different powdered beverages, and a spacious warehouse to support increased production and storage needs. Located near the Columbus Recycling Center, the expanded facility includes advanced blending technologies that ensure high-quality production standards. The project also required careful planning and execution to integrate new construction seamlessly with the existing infrastructure. The successful completion of this expansion underscores Force Construction's expertise in industrial construction and our ability to deliver tailored solutions that meet the specific needs of our clients. By partnering with Tipton Mills, we have helped them enhance their production capabilities and continue their commitment to providing safe and delicious food and beverage products.
An exterior view of the T
16 Jul, 2018
In Tupelo, Mississippi, Force Construction served as the design-build contractor for Toyota Tsusho's $20 million steel coil warehouse and blanking line facility. This project featured detailed press foundations and required innovative engineered solutions to address unforeseen poor soil conditions. Despite these challenges, Force Construction successfully delivered the project on schedule and under budget. The state-of-the-art facility includes a steel coil warehouse and a blanking line, designed to support Toyota Tsusho's operational efficiency and production capacity. Our team's expertise in managing complex industrial construction projects ensured that all aspects of the build met the high standards expected by Toyota Tsusho. This project highlights Force Construction's ability to deliver high-quality, precision-engineered industrial spaces, reinforcing our reputation as a trusted partner in large-scale industrial construction. The successful completion of the Madison Metals plant demonstrates our commitment to overcoming challenges and achieving excellence in every project we undertake.
A photo of Diversity-Vuteq in Princeton, IN
28 Feb, 2018
In Princeton, Indiana, the Phase III Expansion of Diversity-Vuteq, LLC, crafted by Force Construction, marks a significant advancement in the manufacturing capabilities of this key player in the automotive industry. This project introduced 70,000 square feet of new manufacturing space, meticulously designed and constructed to meet the growing demands for high-quality plastic parts used in automotive manufacturing. The expansion includes the addition of four large press foundations, a state-of-the-art electrical room with a mezzanine, and an employee training room, underscoring our commitment to enhancing operational efficiency and workforce development. Diversity-Vuteq's decision to entrust Force Construction with both the design and construction of this crucial expansion project speaks volumes about our expertise in delivering tailored solutions that align with our clients' strategic goals. The newly added manufacturing space is not just an expansion in terms of square footage; it represents a leap forward in Diversity-Vuteq's production capabilities, enabling them to scale up their output significantly. The inclusion of specialized areas such as the press foundations and the electrical room with mezzanine highlights our ability to accommodate the sophisticated machinery and technology that drive today's automotive parts manufacturing. This project is a testament to Force Construction's ability to execute complex industrial expansions that cater to the specific needs of the manufacturing sector. By closely collaborating with Diversity-Vuteq from the initial design phase through to completion, we ensured that every aspect of the Phase III Expansion was aligned with their vision for growth and efficiency. As Diversity-Vuteq utilizes this new space to enhance their production of plastic parts for the automotive industry, the Phase III Expansion stands as a symbol of our shared commitment to innovation, quality, and the future of manufacturing in Indiana.
An aerial view of Nippon Steel in Shelbyville, IN
28 Feb, 2018
In Shelbyville, Indiana, Force Construction proudly took on the role of design-builder for Nippon Steel's cutting-edge coiled rod processing facility. This project stands as a testament to our expertise in delivering highly specialized industrial construction projects that meet the intricate needs of global manufacturing leaders. The new facility is a showcase of engineering precision, incorporating a range of critical features designed to optimize Nippon Steel's production capabilities. The construction of the facility required meticulous planning and execution, particularly due to the extensive sub-grade process utility trenches that form the backbone of the operation's infrastructure. Our team successfully installed over a dozen high-precision equipment foundations, essential for the stability and efficiency of Nippon Steel's manufacturing processes. Additionally, the facility was equipped with fifteen overhead cranes and several transfer cart railways, enhancing operational flow and productivity. A standout feature of this project is the highly-detailed pickling tank system, complete with sloped trenches leading to an on-site wastewater treatment plant, demonstrating our commitment to environmental responsibility alongside manufacturing excellence. Force Construction's work on Nippon Steel's coiled rod processing facility in Shelbyville, Indiana, underscores our capability to handle complex industrial projects from conception to completion. By closely collaborating with Nippon Steel, we ensured that every aspect of the facility was designed and built to support their advanced manufacturing processes, setting new industry standards for efficiency and innovation. This project not only strengthens our portfolio in the manufacturing and industrial sector but also reinforces our position as a trusted partner for companies looking to expand or enhance their production facilities.
An aerial view of GT Industries in North Vernon, IN
28 Apr, 2017
In North Vernon, Indiana, Force Construction Company, Inc. took on a pivotal role in expanding GT Industries' manufacturing capabilities through a 150,000 square foot addition to their warehouse and press-bay facilities. Selected for our competitive design-build expertise, we seamlessly integrated architectural design, engineering precision, and construction efficiency to meet the specific needs of this manufacturing and industrial project. Faced with the challenges of soft soil conditions, environmental preservation mandates from the US Endangered Species Act, and stringent wetland mitigation requirements, our team employed a strategic approach to ensure project success. We adapted our construction methods to stabilize the foundation in soft soil, carefully planned the site to protect local habitats, and navigated the permitting process with the Army Corps of Engineers with meticulous attention to detail. This project for GT Industries not only showcases our ability to address and overcome complex construction challenges but also highlights our commitment to delivering functional, efficient, and environmentally responsible manufacturing facilities. By focusing on innovative solutions and proactive project management, we ensured that GT Industries' expansion was executed with the highest standards of quality and precision, reinforcing our dedication to advancing our clients' operational goals. The successful completion of the GT Industries expansion project in North Vernon, Indiana, reflects Force Construction's expertise in enhancing industrial and manufacturing facilities. It underscores our commitment to providing comprehensive design-build services that meet the evolving needs of the industries we serve.
A photo of the entrance to the Bowen Laboratory at Purdue University
30 Apr, 2008
The Bowen Civil Engineering Laboratory at Purdue University is a cutting-edge facility designed and built by Force Construction to support advanced research in large-scale civil engineering. Situated on a 14.71-acre site in West Lafayette, Indiana, this 66,665 square foot facility serves as a premier research space for testing and analyzing full-scale structures and materials. The laboratory's strong floor, measuring 83 feet by 146 feet, and strong wall, which stands 40 feet tall in an "L" configuration, are engineered to handle up to one million pounds of force with minimal deflection (0.1 inches), making it capable of supporting rigorous structural testing. The facility’s clear interior height of 53 feet allows for the construction of test specimens as large as four stories, and two 30-metric ton overhead cranes with a 45-foot hook height assist in the placement and construction of these large-scale specimens. Beyond the structural testing capabilities, the Bowen Laboratory offers a diverse range of research and support spaces. The ground floor features a 27,352 square foot large-scale testing area, along with specialized areas for durability and small-scale testing, infrastructure materials analysis, and a wood/metal shop. The facility also includes a Teleparticipation Data Acquisition Center, allowing researchers to capture and analyze data in real time, with full fiber-optic and wireless connectivity throughout the building. Designed with functionality and sustainability in mind, the Bowen Laboratory is equipped with high-efficiency heating, cooling, and lighting systems, and is supported by a wet-type fire sprinkler system. The building’s exterior features insulated precast concrete panels and an aluminum-framed glass curtain wall, combining durability with a modern aesthetic. As the result of global benchmarking of research facilities, the Bowen Laboratory is one of the most advanced large-scale civil engineering research centers at any university in the United States. Force Construction’s involvement in the design and construction of this facility reflects our commitment to delivering innovative, highly specialized spaces that advance the boundaries of research and engineering.
An exterior view of the St. Peter's School in Columbus, Indiana. Built by Force Construction.
25 Jun, 2003
In the heart of downtown Columbus, Indiana, Force Construction proudly served as the design-build contractor for the expansion of St. Peter’s Lutheran School, dedicated in 2003. This pre-K through 8th grade facility expansion reflects our long-standing partnership with St. Peter’s Lutheran Church and School, having previously constructed both the church sanctuary and, more recently, the athletic facility affectionately known as 'The Den'. Force Design, a subsidiary of Force Construction, served as the architect for this project. The comprehensive expansion included 24 additional classrooms, teacher preparation areas, administrative offices, a commons area, a music room, and conference areas. A unique pedestrian bridge spans a common entryway lobby area, featuring a “town square” clock, benches, and skylighted gathering spaces, creating a welcoming and functional environment for students and staff. Designed with full accessibility in mind, the building includes elevator access to new and previously constructed areas, ensuring seamless connectivity throughout the school. This includes the gymnasium and cafeteria spaces, as well as additional access to the adjoining church sanctuary. The expansion not only increased the capacity and functionality of St. Peter’s educational facilities but also reinforced our commitment to creating spaces that foster community and learning. Our ability to deliver such a complex project within budget and to the satisfaction of our client underscores our dedication to quality and excellence. The 2003 expansion project for St. Peter’s Lutheran School stands as a testament to Force Construction’s expertise in educational facility construction and our enduring partnership with a valued client. This project, like many others, highlights our commitment to enhancing educational environments through innovative and thoughtful design and construction.